Project

General

Profile

Actions

Tareas #129

closed

Enlarge interval of enteje

Added by Jesús Freire about 7 years ago. Updated almost 7 years ago.

Status:
Cerrada
Priority:
Normal
Assignee:
Target version:
Start date:
Due date:
% Done:

100%

Estimated time:
1:00 h
Spent time:
Puntos de historia:
0

Description

Actually, there is a debug message in the log with the content of ParametrosSeleneLista into the operation LeerEntejes.
The operation LeerEntejes is executed every time the base dialog is showed. Therefore, it is necessary to delete this message.
To prevent the compiler warning about the unused logger, include a new debug message in the log with the selected enteje.
Enlarge the interval of enteje to 10 years before the selected enteje because, actually, there aren't any information in exercises until ten years ago


Related issues 1 (0 open1 closed)

Precedes (15 days) Tareas #160: Shorten interval of entejeCerradaJesús Freire06/06/2018

Actions
Actions #1

Updated by Jesús Freire about 7 years ago

  • Subject changed from Include debug log with the selected enteje to Include debug log with the selected enteje in LeerEntejes
Actions #2

Updated by Jesús Freire about 7 years ago

  • Description updated (diff)
Actions #3

Updated by Jesús Freire about 7 years ago

  • Subject changed from Include debug log with the selected enteje in LeerEntejes to Enlarge interval of enteje in LeerEntejes
  • % Done changed from 10 to 20
Actions #4

Updated by Jesús Freire about 7 years ago

  • Subject changed from Enlarge interval of enteje in LeerEntejes to Enlarge interval of enteje
Actions #5

Updated by Jesús Freire about 7 years ago

  • Status changed from Nueva to En curso
  • Assignee set to Jesús Freire
  • % Done changed from 20 to 30
Actions #6

Updated by Jesús Freire about 7 years ago

  • Status changed from En curso to Resuelta
  • % Done changed from 30 to 90

Applied in changeset selene-j2ee-logic|r528.

Actions #7

Updated by Jesús Freire almost 7 years ago

  • Precedes Tareas #160: Shorten interval of enteje added
Actions #8

Updated by Jesús Freire almost 7 years ago

  • Status changed from Resuelta to Cerrada
  • % Done changed from 90 to 100
Actions

Also available in: Atom PDF